Water infrastructure
Drinking water tanks — Aguas San Pedro
Two reinforced concrete drinking water tanks of 1,500 m³ and 2,000 m³ in Pudahuel and Colina, plus pipework and associated works.
CLP 1,000M+
Track record
12 years and over CLP 2 billion in completed works for companies, educational institutions and private clients.
Clients who have trusted us






Selected work

Water infrastructure
Two reinforced concrete drinking water tanks of 1,500 m³ and 2,000 m³ in Pudahuel and Colina, plus pipework and associated works.
CLP 1,000M+

Commercial premises
Demolition of the existing building, a new steel structure and the complete fit-out of the Solvet veterinary store.
CLP 100M

Commercial premises
Reinforced concrete food-service premises in the centre of Concepción.
CLP 100M

Education
Engineering design and replacement of 1,500 m² of school roofing.
CLP 70M

Industrial
Perimeter fencing, demolition and site set-up for Pacal in Coronel and Hualpén.
CLP 50M

Specialist works
Waterproofing of basement structures at the Duoc UC Concepción campus.
CLP 20M

Civil works
Asphalt paving and external works around the Pedro de Valdivia building in Concepción.
CLP 15M

Public infrastructure
Complete construction of the covered market: engineered timber structure, roofing and paving.
CLP 420M

Public infrastructure
Several contracts including the CIAM Pedro de Valdivia senior centre, public squares and the refurbishment of the Enrique Molina School.
CLP 500M+
Contract values in Chilean pesos (CLP, M = million), as executed by our team. Water tank projects were built in the Santiago area; the rest in southern Chile.
Next step
Share a few details and we will arrange a site visit. If you already have drawings, specifications or photos of the site, send them over WhatsApp or email and we will come prepared.
Office hours (Chile time): Monday to Friday 8:00–18:00 · Saturday 9:00–14:00.