Roof of the Padre Hurtado School in Chillán

For school owners, principals and facility managers

School works, done over the summer break

Roofs, courts, paving and repairs carried out between December and February and planned to be handed over before the school year begins — well suited to international and bilingual schools.

delivered by our team
CLP 2 billion+
delivered by our team
building in Chile
12 years
building in Chile
handover
Before March
handover

Clients who have trusted us

  • Aguas San Pedro logo
  • Duoc UC logo
  • Pacal logo
  • Colegio Padre Hurtado logo
  • Solvet logo
  • Tasty's logo

What we do

Works planned around the school calendar

We visit the school, survey what needs doing and deliver an itemized quote the board can approve with confidence. Works run with the school empty and finish before classes start.

  • Roof repair and replacement, gutters and roof structure
  • Slabs, rubber flooring and sports surfaces
  • Concrete paving for entrances, car parks and walkways
  • New and replacement perimeter fencing
  • Structural repairs and reinforced concrete
Rubber safety flooring being installed in a play area

Your project lead speaks English with you, directly.

The engineer who visits your site, prepares the quote and runs the works is the same person you talk to — in English. Technical decisions, change requests and progress reports reach you first-hand, without an intermediary or a translator on the line.

The process

Book your visit by November to hand over in March

  1. 1

    Site visit

    We walk the school and list what needs to be done.

  2. 2

    Itemized quote

    Every item with quantity and price, ready for the board.

  3. 3

    Summer works

    We work with the school empty, between December and February.

  4. 4

    Handover

    Finished and cleaned before the first day of classes.

Our work

Educational projects we have delivered

Padre Hurtado School roofChillán

Padre Hurtado School

Engineering and replacement of 1,500 m² of roofing.

Freshly finished concrete paving

Paving and access

Concrete paving for entrances, car parks and walkways.

Basement wall waterproofing at Duoc UCHigher education

Duoc UC Concepción

Basement waterproofing at the Concepción campus.

How we work

Clear commercial terms from the first quote

Itemized quote

Every line item with quantity, unit and price, so you can check it against your own budget and approve with confidence.

Advance payment, then progress payments

The agreed price is paid in stages as progress is measured and certified on site — not against calendar dates.

One accountable contractor

A single contract and a single point of contact from the first site visit to handover.

FAQ

Frequently asked questions

When should we book summer works?

Ideally between September and November, so the quote can be approved and materials ordered before the school closes in December.

Can you deliver documentation for the school board?

Yes. The itemized quote is laid out so it can be presented directly to the board or owner for approval.

Next step

Tell us what your school needs

Share a few details and we will arrange a site visit. If you already have drawings, specifications or photos of the site, send them over WhatsApp or email and we will come prepared.

Message us on WhatsApp

Office hours (Chile time): Monday to Friday 8:00–18:00 · Saturday 9:00–14:00.

Payment terms: advance payment and progress payments based on work completed.

Call Terranova